Energy reporting rules that apply in Toronto
3 mandatory rules in force. Each card gives who it covers and the deadline; the official page is linked from every one.
Toronto · Mandatory reporting
In forceEnergy & Water Reporting By-law - Toronto Municipal Code Chapter 367, Building Emissions Performance
Adopted Dec 15, 2023 (By-law 1283-2023) and in force since Jan 1, 2024. Owners report annual energy and water data to the City through ENERGY STAR Portfolio Manager, in addition to Ontario's EWRB. The City says buildings over the size threshold must report 'regardless of property use' (unlike EWRB, which exempts some types); exemptions or extensions can be requested in writing. The City publishes building-level data under its disclosure policy. By-law 1487-2025 (enacted Dec 17, 2025, in force Jan 1, 2026) moved the start date for 10,000-49,999 sq ft buildings from 2026 to 2027.
- Who it covers
- Buildings 4,645 m2 (50,000 sq ft) and larger: reporting since 2024. Buildings 929-4,644 m2 (10,000-49,999 sq ft): must begin reporting in 2027. Buildings 9,290 m2 (100,000 sq ft) and larger: certified-professional verification in the first reporting year and every fifth year.
- Deadline
- First business day of July (July 2, 2026 for 2025 data); the provincial EWRB deadline is July 1.
Toronto · Proposed performance standard
Not adoptedBuilding Emissions Performance Standards (BEPS)
Deferred
No BEPS by-law or emissions limits have been adopted. At its Dec 16-17, 2025 meeting (item 2025.IE26.3, TransformTO Action Plan 2026-2030) Council directed staff to report to the Infrastructure and Environment Committee in Q1 2027 with an economic impact review, updated legal analysis, tenant protection measures and an assessment of changed federal retrofit programs. If adopted, BEPS would sit in Chapter 367. Low-rise residential (3 storeys or less) would be exempt from any BEPS proposal.
Ontario · Mandatory reporting
In forceEnergy and Water Reporting and Benchmarking (EWRB) - O. Reg. 506/18
Owners of large buildings must report the previous calendar year's energy (all fuels) and water use to Ontario's Ministry of Energy and Mines through ENERGY STAR Portfolio Manager every year. Covered types include multi-unit residential (7+ self-contained units), office, retail/services, hospitality, entertainment/recreation, industrial/warehousing, institutional and 'other' (MPAC property codes); exemptions exist. The province publishes building-level intensities, ENERGY STAR scores and GHG intensity (not totals or floor area) on the Ontario Data Catalogue. Toronto buildings must report to both the province and the city.
- Who it covers
- Buildings 50,000 sq ft (4,645 m2) and larger. Buildings 100,000 sq ft and larger need a certified professional to verify data in the first reporting year and every five years after.
- Deadline
- July 1 each year (e.g., July 1, 2026 for 2025 data).
Ontario · Mandatory · public sector
In forceBroader Public Sector energy reporting - O. Reg. 25/23
Broader public sector organizations (e.g., municipalities, hospitals, school boards, universities, colleges) must report annual energy consumption and post Conservation and Demand Management (CDM) plans on their websites, renewed every five years (the last round was due July 2024).
- Who it covers
- Applies by organization type (public agencies), not floor area.
- Deadline
- July 1 each year.
Incentives for audits and studies in Toronto
Programs that pay part of an audit, a feasibility study or metering for buildings in Toronto, open now or with a status to confirm. Most are tied to your utility account and need approval before the work starts.
Enbridge Gas (Ontario)
OpenCommercial Custom Audits & Studies - Energy Assessments and Meters
Pays up to 50% of eligible costs for energy audits, engineering feasibility studies, steam trap surveys/audits, air and water balancing and metering. The cap depends on the address's previous-year gas use: up to $6,000 (100,000 to under 3,000,000 m3), up to $10,000 (3,000,000 to under 10,000,000 m3), up to $20,000 (10,000,000 m3+, institutions only). Institutions max $20,000 per project; other commercial sectors max $10,000 per project.
Who can apply: Enbridge Gas Inc. customers using at least 100,000 m3 of natural gas in the previous year at that address; pre-approval required; one opportunity-identification incentive per address; applicants and Business Partners limited to 5 such projects per year not linked to a completed Custom Retrofit project.
Enbridge Gas (Ontario)
OpenAffordable Housing Multi-Residential Program - energy assessment
Up to $8,000 for an energy assessment (up to $40,000 per housing provider) to find natural gas savings in affordable housing buildings.
Who can apply: Affordable housing providers (Enbridge Gas customers); detailed criteria are on the program page (not read in this pass).
Save on Energy (IESO)
OpenSave on Energy Small Business Program
Free on-site assessment by qualified Save on Energy representatives, then free installed upgrades: up to $3,000 for lighting and up to $2,500 for refrigeration and smart thermostats (up to $5,500 total).
Who can apply: Ontario businesses with 50 or fewer employees that own or lease their space (tenants need landlord consent).
Save on Energy (IESO)
OpenExisting Building Commissioning (EBCx) Program
Funds retro-commissioning. Investigation phase: up to $0.06 per sq ft, max $50,000 per application or 75% of the participant's cost for the commissioning provider. Implementation and persistence phases: $0.03 per kWh of confirmed/persisting savings (each capped at 30% of annual consumption or $50,000, whichever is lower).
Who can apply: Buildings with 12+ months of consecutive energy data, using at least 750,000 kWh/yr (excluding industrial process loads), no commissioning in the last two years, connected to the IESO-controlled grid (directly or behind the meter).
Save on Energy (IESO)
OpenXLerate Program - Project Feasibility Study funding
Project feasibility study (PFS) funding at a 50% cost share; project incentives of $300/MWh up to 75% of eligible costs (max $15 million per project).
Who can apply: Industrial, municipal, institutional and healthcare sectors; projects must save at least 600 MWh of electricity per year. Not aimed at commercial office/retail.
Save on Energy (IESO)
OpenBizEnergySaver Program (local initiative)
Free on-site assessment plus direct installation, with instant discounts applied on the invoice (most VFD upgrades now free).
Who can apply: Non-residential customers of Toronto Hydro, Hydro Ottawa or Hydro One with industrial, commercial, institutional or multi-unit residential facilities in eligible areas: all Toronto 'M' postal codes (expanded to all of Toronto on July 23, 2026) and Ottawa FSAs K1A, K1B, K1C, K1E, K1G, K1H, K1J, K1K, K1L, K1M, K1N, K1P, K1R, K1S, K1T, K1V, K1W, K1X, K1Y, K1Z, K2A, K2B, K2C, K2E, K2G, K2H, K2J, K2K, K2L, K2M, K2P, K2R, K2S, K2T, K2V, K2W, K4A, K4B, K4M, K4P.
City of Toronto (delivered by Enerva Energy Solutions)
OpenBuilding Tune-Up Program
Free expert on-site building assessment (the City says these typically cost $5,000 or more), a customized report of energy-performance opportunities, implementation support, staff training and a follow-up meeting.
Who can apply: Non-profits, community organizations, faith groups and small businesses (up to 50 employees); buildings generally 10,000-30,000 sq ft; condominiums and buildings 50,000 sq ft+ excluded. Participation is limited.
BizEnergySaver has covered all 'M' postal codes since July 23, 2026. The City's Building Tune-Up targets small businesses and non-profits in buildings of roughly 10,000-30,000 sq ft.
Open across Canada
Federation of Canadian Municipalities (Green Municipal Fund)
OpenGreen Municipal Fund - Feasibility study: Green Buildings Pathway
Grant for up to 80% of eligible costs, max $65,000 for one building or $200,000 for a portfolio, to plan GHG-reduction upgrades.
Who can apply: Municipal governments, their project partners and not-for-profits that own community buildings (ice rinks, arenas, pools, community/recreation centres, arts and culture facilities, libraries, multi-purpose buildings). Not for private commercial buildings.
Applies in: all provinces and territories
Which audit level for your building?
Ask any firm which level its quote covers. Most incentive and loan applications ask for Level 2.
-
Level 1
Walk-through
A site visit and a review of the utility bills. It benchmarks the building and lists low-cost and no-cost measures.
-
Level 2
Energy survey and analysis
Where the energy goes, then the savings and cost of each practical measure, including operating and maintenance changes.
-
Level 3
Detailed analysis
Everything in Level 2, plus an in-depth analysis of the cost and savings of the capital-intensive upgrades, often with monitoring and modelling.
Toronto: common questions
Do Toronto buildings have to report energy use?
Yes, above certain sizes or for certain owners. The rules in force: Energy & Water Reporting By-law - Toronto Municipal Code Chapter 367, Building Emissions Performance; Energy and Water Reporting and Benchmarking (EWRB) - O. Reg. 506/18; Broader Public Sector energy reporting - O. Reg. 25/23. Thresholds, deadlines and exemptions differ, so check each rule's official page before you rely on a summary.
Are there incentives for commercial energy audits in Toronto?
Yes, we found 7: Commercial Custom Audits & Studies - Energy Assessments and Meters; Affordable Housing Multi-Residential Program - energy assessment; Save on Energy Small Business Program; Existing Building Commissioning (EBCx) Program; XLerate Program - Project Feasibility Study funding; BizEnergySaver Program (local initiative); Building Tune-Up Program. Most need you to be a customer of the utility and to get pre-approval before the audit starts, so check eligibility first.
What is the difference between an ASHRAE Level 1, 2 and 3 audit?
Level 1 is a walk-through with a utility-bill review and a list of low-cost measures. Level 2 breaks down where the energy goes and prices each practical measure. Level 3 adds monitoring and detailed analysis for capital-intensive projects. Most incentive and loan applications ask for Level 2.
What does a commercial energy audit cost?
It depends on the building's size, its systems and the ASHRAE level. Ask for a fixed fee per level with a list of deliverables, and ask whether an incentive needs pre-approval before the work starts.
I own a house or a condo unit in Toronto. Is this the right site?
No. A house or a single condo unit gets an EnerGuide home evaluation, which AuditYourHome.ca covers city by city. Home energy audits in Toronto →