Energy reporting rules that apply in Saint-Jean-sur-Richelieu
1 mandatory rule in force. Each card gives who it covers and the deadline; the official page is linked from every one.
Quebec · Mandatory reporting
In forceRèglement sur la déclaration obligatoire de la performance environnementale de certains bâtiments (Loi sur la performance environnementale des bâtiments, chapitre P-9.02)
First declarations due June 30, 2027
Enacted by Ministerial Order 2026-0013 (June 9, 2026), published in the Gazette officielle du Québec on June 23, 2026 and in force on the 15th day after publication. Owners must declare each building's energy consumption and costs by source and billing period (first declaration: the two previous calendar years; then the previous year) on the ministry's platform by June 30 each year. Declarations must be verified at least once every four years by a member of a listed professional order (e.g., engineers, architects, CPAs, technologists). Energy distributors must provide digital platforms to transfer consumption data; Quebec's page points owners to ENERGY STAR Portfolio Manager with automatic transfer from Hydro-Québec and Énergir. Excludes buildings under construction or with a demolition permit, agricultural buildings, metro facilities, and buildings on sites whose main activity is manufacturing (NAICS 31-33), mining (21) or water/sewer (2213). Administrative penalties $250-$5,000 and fines up to $3,000,000.
- Who it covers
- From Jan 1, 2027: buildings of 5,000 m2+ (not exclusively residential), residential or partly residential buildings with 50+ units, and buildings owned by public bodies other than municipal bodies (buildings under 100 m2 excepted, subject to a metering condition in the text). From Jan 1, 2028: buildings of 2,000 m2+ (not exclusively residential) and residential buildings with 25+ units.
- Deadline
- June 30 each year; first declaration June 30, 2027 (2025 + 2026 data) for the 2027 group; June 30, 2028 for the 2028 group. Buildings acquired less than 90 days before June 30: by September 30.
Incentives for audits and studies in Saint-Jean-sur-Richelieu
Programs that pay part of an audit, a feasibility study or metering for buildings in Saint-Jean-sur-Richelieu, open now or with a status to confirm. Most are tied to your utility account and need approval before the work starts.
Hydro-Québec
OpenEfficient Solutions Program - Energy Analysis component
Pays for eligible costs of an energy analysis (including in-house labour): 40% of eligible costs when the report is accepted and 60% after at least one measure is implemented (up to 100% in total). Caps for energy-efficiency analyses: existing buildings with 1-2 GWh reference use, $8,000 + $12,000 ($20,000 total), analysis must identify at least 100,000 kWh/yr of savings; over 2 GWh, $20,000 + $30,000 ($50,000 total), at least 200,000 kWh/yr. Analyses that also cover demand-response measures: up to $60,000 ($24,000 + $36,000 for buildings over 2 GWh).
Who can apply: Commercial, institutional or industrial buildings in Quebec using at least 1 GWh/yr, supplied by the Hydro-Québec grid or an eligible off-grid, municipal or co-op system (including Hydro-Sherbrooke and Hydro-Jonquière/Ville de Saguenay). Submit a proposal and get approval before starting.
Gouvernement du Québec (MELCCFP)
OpenÉcoPerformance - Analyse de mesures de réduction des GES
Standard analysis (energy study, fuel-switching study, fugitive-emissions study): 50% of eligible expenses, max $25,000 per site for small/medium energy users (under 36,000 GJ/yr non-electric) or $75,000 for large users. Complex analysis: 75%, max $100,000 / $300,000. Paid 50% on the signed purchase order and the rest after the engineer-signed report is accepted; project must finish within 24 months.
Who can apply: Businesses, institutions, municipalities and organizations in industrial, commercial, agricultural, agri-food, manufacturing, institutional or municipal sectors with a Quebec site that burns fossil fuels (or has fugitive/process emissions). The report must be signed by an OIQ engineer.
Énergir
OpenEnergy audit and implementation - Feasibility Study grant
50% of the pre-tax cost of a feasibility study, max $50,000. Follow-on implementation grant: $1 per m3 of natural gas saved in the first year (max $1,000,000 per account), plus up to $15,000 for energy tracking.
Who can apply: Current or future Énergir customers in commercial, multi-residential (4+ units), institutional or industrial sectors whose building is mainly heated with natural gas; the study must be done by a registered consulting engineering firm (OIQ engineer) and submitted to Énergir before the study starts.
Énergir
OpenRecommissioning of mechanical systems grant
Investigation phase: 75% of eligible costs; implementation: $1 per m3 of gas saved up to 75% of eligible costs (measures with payback over 1 year); transfer and continuous-monitoring phases: 75% of eligible costs. Up to $100,000 per project in total.
Who can apply: Énergir customers; buildings or building groups using at least 75,000 m3 of gas per year (smaller with Énergir approval); must use an accredited RCx agent (MELCCFP list); no Recommissioning or New Construction payment in the last five years.
Open across Canada
Federation of Canadian Municipalities (Green Municipal Fund)
OpenGreen Municipal Fund - Feasibility study: Green Buildings Pathway
Grant for up to 80% of eligible costs, max $65,000 for one building or $200,000 for a portfolio, to plan GHG-reduction upgrades.
Who can apply: Municipal governments, their project partners and not-for-profits that own community buildings (ice rinks, arenas, pools, community/recreation centres, arts and culture facilities, libraries, multi-purpose buildings). Not for private commercial buildings.
Applies in: all provinces and territories
Which audit level for your building?
Ask any firm which level its quote covers. Most incentive and loan applications ask for Level 2.
-
Level 1
Walk-through
A site visit and a review of the utility bills. It benchmarks the building and lists low-cost and no-cost measures.
-
Level 2
Energy survey and analysis
Where the energy goes, then the savings and cost of each practical measure, including operating and maintenance changes.
-
Level 3
Detailed analysis
Everything in Level 2, plus an in-depth analysis of the cost and savings of the capital-intensive upgrades, often with monitoring and modelling.
Saint-Jean-sur-Richelieu: common questions
Do Saint-Jean-sur-Richelieu buildings have to report energy use?
Yes, above certain sizes or for certain owners. The rules in force: Règlement sur la déclaration obligatoire de la performance environnementale de certains bâtiments (Loi sur la performance environnementale des bâtiments, chapitre P-9.02). Thresholds, deadlines and exemptions differ, so check each rule's official page before you rely on a summary.
Are there incentives for commercial energy audits in Saint-Jean-sur-Richelieu?
Yes, we found 4: Efficient Solutions Program - Energy Analysis component; ÉcoPerformance - Analyse de mesures de réduction des GES; Energy audit and implementation - Feasibility Study grant; Recommissioning of mechanical systems grant. Most need you to be a customer of the utility and to get pre-approval before the audit starts, so check eligibility first.
What is the difference between an ASHRAE Level 1, 2 and 3 audit?
Level 1 is a walk-through with a utility-bill review and a list of low-cost measures. Level 2 breaks down where the energy goes and prices each practical measure. Level 3 adds monitoring and detailed analysis for capital-intensive projects. Most incentive and loan applications ask for Level 2.
What does a commercial energy audit cost?
It depends on the building's size, its systems and the ASHRAE level. Ask for a fixed fee per level with a list of deliverables, and ask whether an incentive needs pre-approval before the work starts.
I own a house or a condo unit in Saint-Jean-sur-Richelieu. Is this the right site?
No. A house or a single condo unit gets an EnerGuide home evaluation, which AuditYourHome.ca covers city by city. Home energy audits in Saint-Jean-sur-Richelieu →